| Project: |
Capitola Village Vacation
Rentals, Capitola, California |
| Waterproofing system: |
Deck Membrane Gaco Deck A-58 GW-14-L |
| Project specs:
|
- Reconstruction of failed waterproofing
system at beach side condominiums, which include
complete construction retrofit and stucco exterior
- Sand and level plywood joints
- Polyester tape all end, side
and vertical joints
- Caulk and fill deck abnormalities
- Tape and fill base flashing
perimeters and stair treds
- Install in caulking a sheetmetal
4 x 4 flashing at all deck to wall angles, over
previously taped joints
- Install 4 layer Gaco membrane
Construction Time 5 Days
|
| |
|
|
|
|
| |
| Project: |
Mill Construction Broadway
Ave. Seaside, California |
| Waterproofing system: |
PolyCoat-Aquatight below tile waterproofing |
| Project specs:
|
- Tape all plywood joints
- Apply base coat
- Strip in perimeter metal
- Apply top coat
- Broad cast silca sand
- Construction Time Frame: 3 Days
|
| |
|
|
 |
 |
 |
 |
 |
 |
| |
| Project: |
Eric Miller Architect Pacific
Grove, California |
| Waterproofing system: |
Sonneborn HLM-5000 Foundation Wall Waterproofing |
| Project specs:
|
- 3 applications of HLM-5000
- Drainage panel with filter fabric
- Perforated pipe & drainage rock
- Construction Time Frame: 8 Day
|
| |
|
|
 |
 |
 |
 |
 |
 |
 |
 |
| |
| Project: |
The Pavillions - Fremont,
CA |
| Deck system: |
Gaco GW14 U over concrete surface |
| Project specs:
|
- Create slope to drain
- Builo taper away from wall
- Pressure treated 2x4 cut to taper
and anchores
- Installs diamond and anchores to
concrete deck
- Applied Gaco Crete to create slope
to drain
|
| |
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
|
|